Bayfront Indoor Skatepark
A Miami warehouse street park by Rezlin. Linked banks, raised hubbas, transfer gaps, neon stairs, a skate ditch and halfpipe, with open return lanes, scanned surfaces and detailed warehouse fittings.Bayfront Indoor Skatepark
By Rezlin
Bayfront is a 224 × 80 metre indoor street course set in a Miami warehouse after dark. You start on the west deck facing the full length of the park. The skate shop is on your left and the yellow-bank rail is on your right.
Lines to skate
- Drop into the Schoolyard bank, link the manual gap and the painted Freight Hall plaza, then use either outer lane to ride back. Five crossovers let you pick up a line halfway through.
- Head to the north loading dock for the yellow ten-stair and wide granite hubba. The south Switchyard has a cyan thirteen-stair, and the east terminal has a pink twelve-stair.
- Roll into Outfall 03 from either end of the 25.5 m ditch. Transfer across the side banks or grind the curved divider.
- Find the recessed halfpipe on one side of the Art Deco skate shop and the vert extension on the other. Both short warehouse walls have full-width turning decks.
- Skate the planted Biscayne terrace, the Palm pocket four-stair and bank, the open-supported South Street beam and the technical ribbon on the Freight plaza. Seawall now runs lengthwise with two bank ends, an eight-stair and a banked ledge. The marked curved South Exchange bank has been removed to open its approach area.
- New deck benches, a kinked practice rail and a dogleg curb add trick choices around the existing courts. Scanned warehouse masonry, rebuilt concrete finishes, steel edge wear, detailed wall services and denser planting give the hall more texture and character.
- The North Transfer and Southeast Split Manual lines combine banks, manual decks and optional gaps with rail choices and roll-through bypasses. New bank rails and raised ledges extend the Schoolyard, Freight, Keys, Foundry and Tribune sessions.
- A new soft high-bay light illuminates the painted Bayfront hub. The warehouse floor uses a unique whole-hall texture layout, and new electrical cabinets, conduit, extinguishers and exit fittings add detail around the perimeter.
Install or update
Import the ZIP in the ReSkate mod manager and enable Bayfront Indoor Skatepark. If you have an older Bayfront build installed, keep only version 2.9.0 enabled. Launch the game and select Bayfront Indoor Skatepark from the map list.
Validation
The Blender source, converted collision geometry, grind paths, textures, spawn and ZIP contents were checked. This revision has not yet been playtested in ReSkate; drop-ins, gap difficulty and lighting should be checked in game before public release.
See CHANGELOG.md for the revision history and ASSET_CREDITS.txt for artwork and texture credits.
