Home Communities ReSkate PLYWORKS_Outdoor
Changelog
1.1.0
Expanded the original street plaza with a shared landing, stairs and paired hubbas at both ends, parallel banks, a manual pad and a flatbar.
Aligned the new street lines with the existing two-way flow.
Added 42 PLYWORKS ledge stickers and 13 native grind paths.
Closed the new hubba walls down to ground beside the stair treads.
Included the R17 continuous black Skatelite centre deck and the R18-R19 ramp side-wall repairs throughout the park.
Retained the earlier mural, scenery and layout updates.
Refreshed the pause map and compiled the complete R20 native payload.
1.0.2
Corrected the GoPro Guy mural with a rectangular yellow forehead headband tied at the back, with brown aviators below it.
Retained the R15 layout and collision geometry.
1.0.1
Packaged the R15 feedback and scenery updates with revised loading artwork.
1.0.0
Initial packaged R14 release.
Thunderstore development is made possible with ads. Please consider making an exception to your adblock.